单项选择题
Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources.
Which of the following solutions would best satisfy the requirement?()
A.Loadleveler
B.AIX Workload Manager
C.Partition Load Manager
D.Tivoli Provisioning Manager
相关考题
-
单项选择题
Companycom has been performing scheduled backups of their data to tape using "tar" in a script for over one year with no problems. Recently, the tar command is returning a non zero return code during the backup phase, causing the script to fail. What is the primary cause of this problem?()
A.The files have grown to over eight gigabytes in size
B.The file systems are corrupt, and fsck should be run
C.The tape block size has been changed from the default
D.The user’s limit has been changed to less than eight gigabytes -
单项选择题
A just announced two-port Ethernet card has been installed on a system and it is not recognized. On the HMC the slot shows empty. The device driver has been installed and cfgmgr runs normally. What is the most appropriate action to solve this problem?()
A.Update the HMC software
B.Update the system firmware
C.Re-install the device driver
D.Flash update the two-port card -
单项选择题
WhenconfiguringMicro-Partitioningintosharedprocessorpartitions,whatlimitationsshouldbeconsidered?()
A.Shared processors never affect AIX 5L affinity management.
B.Shared processors can only be implemented with AIX and not with Linux or i5OS.
C.A mix of dedicated and shared processors within the same partition is supported.
D.A mix of dedicated and shared processors within the same partition is not supported.
