欢迎来到易学考试网 易学考试官网
全部科目 > 软件认证工程师考试 > 思科认证考试 > CCNP系列认证 > CCNP(642-902)

单项选择题

Refer to the exhi bit. ROUTE.com is planning to implement load balancing for traffic between host on the 172.16.10.0/24 and 172.16.20./24 networks. You have been asked to review the implementation plan for this project. Which statement about the plan is true?()

    A. It is complete as written.
    B. It should include a task to configure multipath to equal a value of 2 on R1 and R4.
    C. It should use a ping instead of a traceroute to validate that load balancing has been activated.
    D. It should conta in a task that documents the changes made to the configurations.

点击查看答案

相关考题

微信小程序免费搜题
微信扫一扫,加关注免费搜题

微信扫一扫,加关注免费搜题